serene – 2, part 24

here’re quite a lot of works required on the deck. First, I need to make various small wooden parts: the bungee cords’ anchor points (14 of them), the cleats (6) used to tie the hatches down, the rudder post, wooden balls for line pulling, etc… all is very “small” wood working, you would need to work on parts that a just a few centimeters in size, an ugly type of work which I don’t like, since I don’t really have skillful hands for that.

Second image: various wooden parts. First image: cut half – curve grooves for making the bungee lines’ anchor point using my router. The bungee would loop through that grooves, going from the external side, through the deck, then back to the external side again. There’re 14 anchor points like that to be installed, 8 around the cockpit, 4 on the aft deck, and 2 on the fore deck. Here, I learn to cut with the router following a template.

Third image: fitting the cockpit anchor points, the installation is quite simple and straightforward, the wooden blocks are glued on, with steel wire fastening through the holes, later some little putty would be filled in the jointing edges, and maybe some glassing too. This way, the bungee cords’ anchor points are made so simple, easier to implement, not the same nasty, clumsy way as in all of my previous boats.

Next in installing the rudder control lines’ tubes. Those are 6 – mm diameter (4 – mm internally) plastic tubes that run from the cockpit, through the day – compartment and aft compartment to near the stern, running through 4 cable glands on the way for each tube. The installation is quite messy, as I was using too much silicone glue, in an anxiety to assure that these cable glands would be completely waterproof.